GUWAHATI: The All Assam Students' Union (Aasu ) on Sunday came down heavily on the NHPC's claim that the Lower Subansiri hydro-electric dam has been designed in way so that it can withstand any high seismic activity. The students' union alleged that the NHPC officials were trying to distort truth for their personal gain.
"The NHPC has tried to avoid the real scenario. We will like to ask them to sit with experts of Gauhati University and IIT Guwahati here," Aasu president Shankar Prasad Rai, adding, "NHPC has been silent on the cumulative downstream impact on the people living on the downstream areas if the Lower Subansiri hydro-electric dam and 168 other hydro-projects come up in Arunachal Pradesh."
In 2006, Rai claimed, "NHPC had admitted that it was not going ahead with the project without a proper study on the dams' downstream effects."
Last week, senior NHPC officials had claimed that the 2,000 MW Lower Subansiri project has been designed after a detailed investigation and studies on tectonic features of the dam site.